首页 体育内容详情
Fukushima debris removal delayed by another year

Fukushima debris removal delayed by another year

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠注册平台www.hg108.vip)是一个开放皇冠即时比分、皇冠官网注册的平台。皇冠注册平台(www.hg108.vip)专业解决皇冠会员怎么申请开户、怎么申请皇冠信用盘代理、皇冠公司的代理怎么拿的问题。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

新2线上开户www.hg108.vip)是一个开放皇冠正网即时比分、新2线上开户的平台。新2线上开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论